3x 220 KV Substations in Zawai, Benghazi Central and
Raslanouf. |
|
|
|
Supplier: |
|
|
Client: |
General Electric Company of Libya (GECOL)
|
|
Volume: |
9.500 frt , appr. 2.600 tons
|
|
Period: |
September 2004 to January 2006
|
|
Cargo: |
6 Transformer each 89,5 ton
3 Transformer each 59 tons
|
 |
Discharging at Marsa El Berga Port with
400 tons mobile crane from Vessel.
|
| |
|
 |
En route to the Substation in Benghazi
Central (350 Km From the Marsa EL Brega
Port to the Site).
|
| |
|
 |
Arriving on Jobsite Benghazi Central 220 KV
Substation.
|
 |
Preparation of the entrance of the Site.
|
|
|
|
 |
Placing and Setting of the Transformer
on to
Foundation.
|
|
|
|